The Gulf’s next giga-project is already standing


· 5 min read
Battling a climate where functioning infrastructure is a matter of survival rather than comfort, the CIBSE MENA Retrofit Conference takes place on 25 November at the Renaissance Business Bay Hotel in Dubai. Free to attend with limited places, it will bring together the engineers, owners, investors and policymakers deciding how the region’s existing buildings can be made to perform for decades to come.
On 27 October, more than 130 engineers, policymakers, owners and operators gathered with us at the same venue for the CIBSE MENA Decarbonisation Conference. The discussions in the room, and in the corridors around it, pointed to a conclusion that now shapes our agenda: the region’s decarbonisation will be decided as much by the buildings already standing as by those still on the drawing board.
CIBSE President Dave Cooper at the CIBSE MENA Decarbonisation Conference, 27 October 2026, Dubai
MENA is rightly known for ambitious new development, from Riyadh’s giga-projects to Dubai’s expanding skyline. Every new high-performing building, however, joins a far larger stock of existing assets, many of them ageing, many operating well below their potential, and all of them expected to serve for decades.
In Dubai, buildings account for around 70% of electricity use. The emirate’s Demand Side Management Strategy targets savings of 30% against business-as-usual consumption by 2030 and 50% by 2050, and the Dubai Supreme Council of Energy aims to retrofit 30,000 buildings by the end of the decade. By mid-2023, around 8,000 had been retrofitted, 7,791 of them government buildings, which leaves most of the private stock, from hotels and offices to residential towers, still to be addressed.
Abu Dhabi is moving in the same direction, with the number of buildings in its retrofit programme set to rise from 200 in 2025 to 300 in 2026.
Digital infrastructure adds a newer pressure. Knight Frank forecasts Middle East data centre capacity to grow from 1.2 GW at the end of 2025 to 3.2 GW by 2027, and much of the existing estate was designed before AI workloads pushed power and cooling densities sharply upwards, leaving operators to choose between retrofitting, re-powering and rebuilding.
The direction was already visible at our CIBSE MENA Awards on 29 October, where Dubai Municipality’s Renewable Energy and Energy Efficiency Programme was named Retrofit Project of the Year, and DCServe’s Delta T optimisation and pumping upgrade at Five Hotel Palm Jumeirah received a Highly Commended distinction.
Speakers at the CIBSE MENA Decarbonisation Conference
The conference opens with a welcome from our Deputy Chair, Marc Lynch, on The next chapter for GCC real estate, examining why the region’s built environment story will increasingly turn on optimising, adapting and extending the life of existing assets. I follow with a short address, Why retrofit, why now?, connecting carbon, asset performance, operating cost and resilience with the engineering leadership needed to deliver measurable outcomes.
The keynote, Accelerating retrofit: Policy, energy & the net zero transition, comes from Majd Fayyad of the Dubai Supreme Council of Energy, who will set out the policy and energy drivers behind retrofit across the region. The programme then turns to the practical questions owners and engineers face.
A panel I will moderate on balancing energy, comfort and commercial performance, with Brian Lugg of H&H and Dr Pablo Izquierdo Lopez of Abu Dhabi Energy. Hotels combine high energy intensity, demanding guest expectations and ageing systems, so any intervention has to protect operations and revenue.
Retrofit, re-power or rebuild? Preparing existing facilities for the AI era, moderated by Yasser Ali Khan of WSP in the Middle East, on what to do with existing facilities as demand for digital infrastructure accelerates.
Who pays, who benefits, and who takes the risk?, moderated by Marc Lynch, on one of the biggest barriers to retrofit: who bears the cost and who captures the value.
Retrofit in action: Turning existing assets into high-performance buildings, an international example of an existing asset transformed.
Retrofit before replace: Getting more from existing MEP systems, from Barnie Bouwer of Ramboll, on how much performance can be recovered from systems already installed.
Beyond energy savings: Rethinking retrofit for people, performance & planet, moderated by Neethu Susan George of Trilux, which widens the conversation from kilowatt-hours to wellbeing and long-term value.
Headline sponsor Huda Lighting will also present a CPD session, Lighting the retrofit: From energy reduction to better building experience.
Where the Decarbonisation Conference set the region’s direction, the Retrofit Conference is designed to get specific: what to measure, what to fix first, who pays, and how to know it worked. It is aimed at everyone who designs, owns, operates or advises on existing buildings in the region.
The CIBSE MENA Retrofit Conference takes place on Wednesday 25 November, from 08:00 to 17:00, at the Renaissance Business Bay Hotel in Dubai. Attendance is free of charge and places are limited. Register on the CIBSE MENA Retrofit Conference page.
illuminem Voices is a democratic space presenting the opinions of leading Sustainability Thought Leaders, their views do not necessarily represent those of illuminem.
The world needs sustainability knowledge. At illuminem, no interest group or shareholder can influence our work. Thank you for supporting our mission to make high-quality and independent sustainability information free for all. Every contribution helps. Thank you for donating today.
Imran Shaikh

Cities · Architecture
Steven W. Pearce

Climate Change · Adaptation
Steven W. Pearce

Cities · Insurance
UN News

Cities · Climate Change
Euronews

Cities · Ethical Governance
AP News

Social Responsibility · Cities